在线观看黄片视频大全,男人用嘴添女人私密视频,国产成人综合亚洲亚洲第一,中文字菲一区二区三区精品

Service hotline:

0315-5913666

+86-18931500255

Domestic > Kailuan Lujiatuo Coal Washing Plant Hazardous Old Renovation and Technical Upgrade Project
呂家坨(選用).jpg
  • 呂家坨(選用).jpg

Kailuan Lujiatuo Coal Washing Plant Hazardous Old Renovation and Technical Upgrade Project

Type: Coking coal preparation plant

Scale: 3.6Mt/a

Contracting mode: partial contracting and renovation projects

Process: The 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. The coarse coal slurry is sorted by the coal slurry heavy medium cyclone, while the fine coal slurry is sorted by a flotation machine. The existing system is used for flotation, pressure filtration, and concentration, and the washing water is closed loop, which is environmentally friendly and energy-saving.